Being developed via six UHPHT production wells drilled by a heavy-duty jack-up drilling rig. The field facilities comprise a wellhead platform bridge-linked to a central processing facility platform, which in turn is bridge-linked to a utilities and living quarters platform.
The processed gas is exported via a 52 km 22” pipeline tied into the central area transmission system, which gathers processed gas from various offshore installations for delivery onshore at Teesside, UK, while the associated condensate is exported to a floating storage and offloading facility 3 km away for offloading by shuttle tankers.
Forecast production is 500 mmscfd of Gas and 25,000 bblpd of oil when fully stabilized.